Case Studies
Case Studies
Selected Hexin projects in the automotive, medical, and home appliance sectors. Each solution was tailored to the specific client, product, and project. The cases shown here are just a sample: Hexin has completed projects in numerous other industries—and the selection is constantly expanding.
Industries
Case Studies by Industry
Requirements vary depending on the client, product, and project. The following industries are featured in the case studies on this page—in addition, Hexin has completed projects in other industries as well.
Automotive
Seat assembly, sunroof, engines, EOL testing, wheels.
Medical
Precision assembly and large equipment with lead shielding.
Home appliances
Variant assembly with flexible switching.
Overview
Eight Cases at a Glance
Eight completed projects with documented metrics. Clicking on each entry reveals the context, solution, and results.
Assembly line
Sunroof Line
120-second cycle time
6-month lead time
Mixed-model assembly
Seat installation
43-second cycle time
1,466 units per day
Engine Assembly
Engine Assembly
≤115 s line cycle time
≤90 s station cycle time
Subassembly
Wheel Assembly
18″ / 20″ wheel sizes
Multiple facilities worldwide
EOL & Testing
EOL testing
12-second cycle time
End-to-end data traceability
Fully automated assembly
Medical: Precision Assembly
5.5-second cycle time
: Fully automatic from feeding to inspection
Heavy Equipment Line
Medical: Large Equipment
−50% space requirement
720 → 400 min processing time
Variant assembly
Home appliances
40-second cycle time
: Fully automatic end cap assembly
Case Studies in Detail
Context, Solution, Results
For each case, you can view the context, challenge, solution, and documented metrics.
Sunroof Production Line - Premium Passenger Cars
- Bosch Transfer – Bosch transfer technology as the backbone of the production line.
- ABB Robotic Adhesive Application – Robot-assisted adhesive application for consistent results.
- Vision Inspection – Image Processing with a Traceability System.
- Acoustic Test – Regular online acoustic testing.
Seat Assembly - Mixed-Model Line
- Assembly and inspection stations – Automated assembly and inspection stations arranged in a row.
- RFID Traceability – Individual item identification throughout the entire production line.
- PLC Process Monitoring – Real-time data from every station.
- Vision-based error prevention – Image-based poka-yoke inspection.
- Force and Noise Testing – End-of-Line Functional Test.
Engine Assembly - AGV & MES
- Automated stations – fully automated screwing and testing in sync with the production cycle.
- AGV Material Handling – Automated guided vehicles supply the stations.
- Dual Dashboards – Two production dashboards for line and plant views.
- MES Integration – Traceability and Monitoring via MES.
Medical: Precision Assembly - 5.5-second cycle time
- Four-axis robots – Coordinated robots for precise handling.
- High-precision vision – image processing for position and quality control.
- Laser welding – A clean joining technique for small components.
- Integrated stations – feeding, assembly, welding, and inspection all in a single line.
Medical: Large Equipment - Assembly and Testing
- Lead-shielded tunnel structure – integrated radiation protection for operators.
- Modular Drive System – Universal Pallets for Assembly and Testing.
- Combined process – assembly and testing in a single production run.
- Safe environment – protecting employees in the test area.
Home Appliances - Variant Assembly
- Robotic Pick-and-Place – Gripping and placing using robots.
- Automatic feeding – Parts are fed automatically.
- Secondary positioning – position correction prior to installation.
- Pneumatic Assembly – Reproducible clamping force.
- Variant switching – Quickly switch between product variants.
Wheel Assembly - Global Line
- 18-inch and 20-inch wheels – The line supports two wheel sizes.
- Quick changeover – Fast switching between variants.
- In-line inspection – Quality is checked at every step of the production line.
- Replication Design – Designed for multiple international facilities.
EOL Testing - Automotive Electronics
- Material Handling – Seamless material flow between stations.
- Robotic handling – Component handling using robots.
- Plasma cleaning – Cleaning prior to joining or coating.
- Online EOL Test – End-of-line testing on a regular basis.
- PC Traceability – Data tracking via a PC system.
Project in the works?
Inquiries that include details about the component, quantity, and industry will be answered within one to two business days. We also carry out projects within the timeframe specified by the customer. Estimated timeframes: 4–6 months for domestic projects, 6–8 months for international projects.